Railway Projects

(Engineering, Procurement and Construction)

EPC - Railway Projects - Work In Hand

Sr. No Name of Project Employer Name Contract Price / Estimated Construction Cost  (in Rs. Cr)  (in Rs. Million)
1 Package- 1 - "Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails, and track sleepers), Electrical (General Electrification), Provision of OHE, Signalling and telecommunication works in connection with 3rd Line from Sonnagar (including) Km 411.83 to Japla (including) Km 366.01(Total 45.82 Km) in Mughalsarai Division of East Central Railway, Bihar & Jharkhand, India". RVNL 556.55 5,565.50
2 Package- 2 - "Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails, and track sleepers), Electrical (General Electrification), Provision of OHE, Signalling and telecommunication works in connection with 3rd Line from Japla (excluding) Km 366.01 to Garhwa Road (excluding) Km 319.04 (Total 46.97 Km) in Mughalsarai Division of East Central Railway, Jharkhand, India". RVNL 593.04 5,930.40
3 Package No.2 (RBD-2) -"Construction of Roadbed, minor bridges, supply of ballast, Installation of track (excluding supply of rails, PSC sleepers & Thick web switches), Electrical (Railway Electrification and General Electrification), Signaling and Telecommunication works for Doubling of track between Kakrala Halt (Excluding) and Hadiaya (Including) from km 57.50 to 115.64 in Ambala Division of Northern Railway, Punjab, India." RVNL 597.60 5,976.00
4 Provision of Supply, Erection, Testing & Commissioning of Electro Mechanical (E&M) System which includes 33/11kV & 11/0.433kv GIS Substations, 33kV & 11kV Power Cable network, DG Sets, Ventilation & Control System, Lighting, UPS System, Fire Fighting System & SCADA System, etc. and associated works complete in all respect as required for Tunnel T-14 & T-15 + T- 40/41 on Dharam - Katra Section of USBRL Project (J&K) - (Package: T-14 & T-15 + T-40/41, E&M) IRCON 482.64 4,826.40
5 EPC Gauge Conversion of Bechraji (63.83 KM) – Ranuj (101.983 KM) Section, Total Length of 38.153 KM Metre Gauge to Broad Gauge with 25 KV AC Electrification in Ahmedabad Division of Western Railway G-RIDE 337.87 3,378.70
6 Electrification of Railway Lines of the sections Rangiya (Excl.)- Murkongselek including branch lines of Rangapara North (Excl.)- Dekargaon, Balipara(Excl.)- Bhalukpong, Harmuty (Excl.)- Naharlagun, Sripani - Dhamalgaon(Excl) , Furkating Jn.(Excl.) to Mariani Jn.(Excl.) And Tinsukia to Dangri Section including branch line of Makum Jn to Tirap, Northeast Frontier Railway RKM / TKM - 733.35 /947.59 on EPC mode. NFR 692.50 6,924.99
7 Provision of Train Collision Avoidance System (KAVACH) along with two 24 Fiber OFC backbone in the sections between Pt. Deen Dayal Upadhyay (DDU) and Pradhankhunta (PKA) of the East Central Railway EAST CENTRAL RLY 208.89 2,088.91
8 Construction Of New Bg Line Between Chainage 192.000 And Chainage 171.640 Including Electrical & Telecommunication Works Between Tolahunse (Ex.) & Bharmasagar (Ex.) Stations ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE SOUTH WESTERN RLY 258.13 2,581.25
9  Seroni Road (excluding) to Sheopurkalan (including) GC Project exluding TRD and S&T work in connection with Gwalior - Sheopurkalan GC Project of North Central Railway  NORTH CENTRAL RAILWAY (NCR) 284.65 2,846.51

EPC - Railway Projects - Completed

Sr. No Name of Project Employer Name Contract Price / Estimated Construction Cost  (in Rs. Cr)  (in Rs. Million)
1 Design, Supply, Installation, testing & Commissioning of 25 kV, AC, 50 Hz, single phase Railway Electrification works between Katni (Excl.)–Bara (Incl.) section in connection with Katni-Singrauli doubling project of West Central Railway Total Length 107.33 TKM IRCON 56.04 560.40