| 1 | 
    Package- 1 -    "Construction of roadbed, bridges, supply of ballast, Installation of track    (excluding supply of rails, and track sleepers), Electrical (General    Electrification), Provision of OHE, Signalling and telecommunication works in    connection with 3rd Line from Sonnagar (including) Km 411.83 to Japla    (including) Km 366.01(Total 45.82 Km) in Mughalsarai Division of East Central    Railway, Bihar & Jharkhand, India". | 
    RVNL | 
    589.64  | 
    5,896.40  | 
  
  
    | 2 | 
    Package-    2 - "Construction of roadbed, bridges, supply of ballast, Installation of    track (excluding supply of rails, and track sleepers), Electrical (General    Electrification), Provision of OHE, Signalling and telecommunication works in    connection with 3rd Line from Japla (excluding) Km 366.01 to Garhwa Road    (excluding) Km 319.04 (Total 46.97 Km) in Mughalsarai Division of East    Central Railway, Jharkhand, India". | 
    RVNL | 
    651.30  | 
    6,513.30  | 
  
  
    | 3 | 
    Package    No.2 (RBD-2) -"Construction of Roadbed, minor bridges, supply of ballast,    Installation of track (excluding supply of rails, PSC sleepers & Thick    web switches), Electrical (Railway Electrification and General    Electrification), Signaling and Telecommunication works for Doubling of track    between Kakrala Halt (Excluding) and Hadiaya (Including) from km 57.50 to    115.64 in Ambala Division of Northern Railway, Punjab, India." | 
    RVNL | 
    602.66  | 
    6,026.66  | 
  
  
    | 4 | 
    Provision    of Supply, Erection, Testing & Commissioning of Electro Mechanical    (E&M) System which includes 33/11kV & 11/0.433kv GIS Substations,    33kV & 11kV Power Cable network, DG Sets, Ventilation & Control    System, Lighting, UPS System, Fire Fighting System & SCADA System, etc.    and associated works complete in all respect as required for Tunnel T-14    & T-15 + T- 40/41 on Dharam - Katra Section of USBRL Project (J&K) -    (Package: T-14 & T-15 + T-40/41, E&M) | 
    IRCON | 
    596.09  | 
    5,960.90  | 
  
  
  
    | 5 | 
    Electrification    of Railway Lines of the sections Rangiya (Excl.)- Murkongselek including    branch lines of Rangapara North (Excl.)- Dekargaon, Balipara(Excl.)-    Bhalukpong, Harmuty (Excl.)- Naharlagun, Sripani - Dhamalgaon(Excl) ,    Furkating Jn.(Excl.) to Mariani Jn.(Excl.) And Tinsukia to Dangri Section    including branch line of Makum Jn to Tirap, Northeast Frontier Railway RKM /    TKM - 733.35 /947.59 on EPC mode. | 
    NFR | 
    756.90  | 
    7,569.00  | 
  
  
    | 6 | 
    Provision    of Train Collision Avoidance System (KAVACH) along with two 24 Fiber OFC    backbone in the sections between Pt. Deen Dayal Upadhyay (DDU) and    Pradhankhunta (PKA) of the East Central Railway | 
    EAST    CENTRAL RLY | 
    255.10  | 
    2,550.10  | 
  
  
    | 7 | 
    Construction    Of New Bg Line Between Chainage 192.000 And Chainage 171.640 Including    Electrical & Telecommunication Works Between Tolahunse (Ex.) &    Bharmasagar (Ex.) Stations ON ENGINEERING, PROCUREMENT & CONSTRUCTION    (EPC) MODE | 
    SOUTH    WESTERN RLY | 
    271.94  | 
    2,719.43  | 
  
  
    | 8 | 
     Seroni Road (excluding) to Sheopurkalan    (including) GC Project exluding TRD and S&T work in connection with    Gwalior - Sheopurkalan GC Project of North Central Railway | 
     NORTH CENTRAL RAILWAY (NCR) | 
    284.65  | 
    2,846.51  |