Sr. No. Name of Projects State Authority
1 Construction of Bridge and its approaches A/C Wainganga river in km 491/00 of Nagpur- Raipur road section of N.H.6 in Bhandara District under B.O.T scheme with toll rights (JAIPL) Madhya Pradesh MORTH
2 Six laning of Belgaum – Dharwad section of NH-4 from km 433.00 to km 515.00 (Length – 79.36 Km) in the state of Karnataka to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase – V (Package No.: NHDP – V/MC-II/19). Karnataka NHAI
3 Four laning of Sambalpur-Baragarh-Orissa/Chhatisgarh Border section of NH-6 from km 0.00 to km 88.00 in the state of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III Orissa NHAI
4 Six laning of Dhankuni- Kharagpur Section of NH-6 from Km 17.600 to Km 129.000 in the state of West Bengal to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase V. West Bengal NHAI
5 Design, Engineering, Finance, Construction, Operation & Maintenance Chattisgarh / Maharashtra Border–Wainganga Bridge section from Km 405.000 to Km. 485.000 of NH-6 in the State of Maharashtra under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis Maharashtra NHAI
6 Design, Engineering, Finance, Construction, Operation & Maintenance of End of Durg Bypass - Chattisgarh / Maharashtra Border from Km 322.4 to Km. 405.000 of NH-6 under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis Chattisgarh NHAI
7 Development of Jaora-Nayagaon section from km. 125.00 to 252.81 on SH-31 to 4-Lane section in the State of Madhya Pradesh on BOT Basis. Madhya Pradesh MPRDC

On-going Projects (DBFOMT Annuity)

Sr. No. Name of Projects State Authority
1 Construction of Chennai Outer Ring Road Phase II from Nemilicheri in NH-205 to Minjur in TPP road at Chennai in the state of Tamil Nadu on DBFOT Basis Tamil Nadu TNRDC
2 KSHIP-II Project WAP-2: “Design, Build, Finance Operate, Maintain and Transfer of Existing State Highway (SH 18) from Mudhol to Maharastra Border (Approx length 107.937 Kms) in the State of Karnataka on DBFOMT Annuity Karnataka KSHIP
3 Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway Hungund – Muddebihal – Talikot in the state of Karnataka on DBFOMT Annuity Basis (WCP-7)” Karnataka KRDCL
4 Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway Bagewadi (NH-4) – Bailhongal – Saundatti in the state of Karnataka on DBFOMT Annuity Basis (WCP-1)” Karnataka KRDCL

On-going Projects (Hybrid Annuity)

Sr. No. On-going Projects State Authority
1 4/6 Laning of Kharar to Ludhiana Section of NH-95 (New NH-05) From Kharar KM. 10+185 (design chainage) To Samrala Chowk, Ludhiana KM 86+199 (design chainage) in the State of Punjab On Hybrid Annuity Mode. Punjab NHAI
2 Six-laning of Ranastalam-Anandpuram section of NH-16 from km 634.000 to km 681.000 in the State of Andhra Pradesh under NHDP Phase-V on Hybrid Annuity Mode. Andhra Pradesh NHAI
3 Six laning of Khairatunda - Barwa Adda of NH-2 from Km 360.000 to Km 400.132 section on Hybrid Annuity Mode in the State of Jharkhand under NHDP Phase-V. Jharkhand NHAI
4 Four Laning of Tumkur-Shivamogga Section from Km. 12+310 (Design Km. 12+300) to Km. 66+540 (Design Km. 65+195) from Mallasandra to Karadi Village of NH-206 under NHDP-Phase-IV on hybrid Annuity Mode, in the State Karnataka (Package-I) Karnataka NHAI
5 Four Laning of Tumkur - Shivamogga section from Km. 66+540 (Design Ch. 65+195) (Karadi) to Km. 119.970 (Design Ch. 121.900) (Banwara) of NH-206 under NHDP- PHASE-IV on HAM in the state of Karnataka (Package-II) Karnataka NHAI
6 4 Lanning of Belgaum - Khanapur Section (Km 0+000 - Km 30+800) (Design Chainage Km 0+000 to Km 30.000) of NH-4A in the State of Karnataka on Hybrid Annuity Mode. Karnataka NHAI
7 Construction of Eight Lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Ankleshwar to Manubar section of Vadodara Mumbai Expressway) in the state of Gujarat under NHDP Phase -VI on Hybrid Annuity mode. Gujarat NHAI
8 Four laning of Tumkur- Shivamogga section from Ch.170+415 km to Ch.226+750Km, Bettadahalli Shivamogga of NH-206 on Hybrid annuity mode under Bharatmala Pariyojna in the state of Karnataka (Package-IV). Karnataka NHAI
9 Four laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) (Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojna on HAM Mode Telangana NHAI
10 Four lanning of Tumkur - Shivamogga section from Km. 121+900 (Banwara) to Km. 170+415 (Bettadahalli) section of NH-206 in the state of Karnataka on Hybrid annuity mode under Bharatmala Pariyojana (Package-III). Karnataka NHAI
11 Development of 6-lane Greenfield Highway from Km 162.500 to Km 203.100 Baswantpur to Singnodi section (Package-IV of Akkalkot – KNT/TS Border) in the state of Karnataka Karnataka NHAI

Completed Projects - Projects that have been 'Transferred' to the client after completion

Sr. No. BOT Completed Projects State Authority
1 Improvements to Surat – Dhule Road (M.S.H. No. 7 ) from k.m. 527/400 to 553/000 including construction of diversion outside Dhule town (5.90 k.m.) in Dhule District. Maharashtra PWD
2 Four lanning and strengthening of Pune Ahmednagar Road, S. H. 60 KM 10/600 to 64/00 on B.O.T. basis.- Maharashtra PWD
3 Construction of R.O.B. with approaches near Nashirabad village at Km.415/800 of Dhule – Nagpur Road N.H.6 in lieu of level crossing at Railway Km.433/17-19 with strengthening to Km.414/00 to 419/00 of N.H.6 under B.O.T. Scheme (with toll rights)”. Maharashtra MORTH
4 Improvement To S.H 76 To Takali Kasegaon Anwali Road M.D.R 71 Km 0/000 T0 11/000 With Private Finance And Toll Rights On Build, Operate Transfer (BOT) Basis Maharashtra PWD
5 Development of Indore - Edlabad Road Project (SH-27). Madhya Pradesh MPRDC
6 Construction of Dewas Bye Pass under BOT basis. Madhya Pradesh PWD
7 Upgradation of Infrastructual Services and Enviormental Improvement at Nandanagar. Madhya Pradesh IMC
8 Improvement to Akola Mini Bypass Road including Bridge on Morna River (Km 1/600) in Akola District on B.O.T. Scheme. Maharashtra PWD
9 Four Lanning in km. 120/200 to 155/600 & Widening to three Lane in km. 155/600 of Ahmednagar – Aurangabad Road (SH – 60). Maharashtra PWD
10 Six Laning of Pimpalgaon-Nashik-Gonde Section of NH-3 from Km 380.00 to Km 440.00 in the state of Maharashtra under NHDP Phase III on DBFOT basis Maharashtra NHAI
11 Construction of Katni Bypass on NH-7 from Km 361/2 to 378/6 around Katni Town in Madhya Pradesh, India on BOT Basis. Madhya Pradesh MORTH
12 Construction of four lane access controlled Chittorgarh bye-pass road at Chittorgarh, Rajasthan. NHAI, New Delhi Rajasthan
13 Ankali Bridge Maharashtra PWD
14 Mandve Bridge Maharashtra PWD
15 Ahmednagar-Karmala Maharashtra PWD
16 Sheree Nalla (Krishna River Bridge) Sangali Maharashtra PWD
17 Foot Over bridge on Eastern Express Highway - NH - 3 Maharashtra PWD