Name of Project Lane Kms Name of Concession Operator (Company’s Beneficial Interest) Estimated Project Cost in Rs. million
NH-6 Durg Bypass, Chhattisgarh -Maharashtra Border Road 332 Ashoka Highways (Durg) Limited
(53.18%)
5,870.00
Jaora – Nayagaon Road 319 Jaora Nayagaon Toll Road Company Private Limited (13.76%) 8,180.00
NH-3 Pimpalgaon – Nashik – Gonde road (JV with L&T) 452 PNG Tollway Private Limited (26.00%) 14,070.30(1)
NH-4 Belgaum-Dharwad Road 454 Ashoka Belgaum Dharwad Tollway Private Limited (98.67%) 6,300.00(2)
NH-6 Sambalpur-Baragarh Road 408 Ashoka Sambalpur-Baragarh Tollway Private Limited (98.67%) 10,080.00(3)
NH-6 Dhankuni to Kharagpur Section 840.50 Ashoka Dhankuni Kharagpur Tollway Limited 20,160.00(4)
   
1. This is the estimated EPC cost and does not include any interest paid on any debt financing during construction of the project and other expenses incidental to the project during the construction period. The Company has entered into an EPC agreement with PNG Tollway Private Limited for the Company to construct the road, except for an elevated corridor, for a fixed price of Rs. 5,805.40 million and utility on sanction basis. PNG Tollway Private Limited has awarded the EPC contract for the elevated corridor part of the road to Larsen & Toubro Limited for a fixed price of Rs. 8,264.90 million.
   
2. This is the estimated EPC cost and does not include any interest paid on any debt financing during construction of the project and other expenses incidental to the project during the construction period.
   
3. This is the estimated EPC cost and does not include any interest paid on any debt financing during construction of the project and other expenses incidental to the project during the construction period.
   
4. This is the estimated EPC cost and does not include any interest paid on any debt financing during construction of the project and other expenses incidental to the project during the construction period.
   
BOT PROJECTS IN OPERATION
Summary details of 18 BOT projects are set forth in the table below.
 
Name of Project Lane Kilometres Name of Concession Operator (Company’s Beneficial Interest) Project Cost in Rs. Million
NH-6 Bhandara Road 320 Ashoka Highways (Bhandara) Limited
(52.02%)(1)
5,350.00
Indore – Edalabad Road 406 Viva Highways Private Limited (86.74%)(1) 1,652.88
Pune – Shirur Road 216 Ashoka Infrastructure Limited
(100%)
1,610.05
Ahmednagar – Aurangabad Road 168 The Company (100%) 1,026.64
Katni Bypass 35 Ashoka-DSC Katni Bypass Road Private Limited (99.89%) 708.58
Dewas Bypass 40 Ashoka Infraways Private Limited (100%) 613.22
Ahmednagar – Karmala Road 160 The Company (100%) 503.51
Wainganga Bridge 26 Jayaswals Ashoka Infrastructure Limited (50%)(1) 408.69
Nashirabad Railway-Over Bridge 8 The Company (100%) 146.97
Sheri Nallah Bridge 7 The Company (100%) 142.22
Dhule Bypass 12 Ashoka Infrastructures (99.99%) 58.17
Foot-Over-Bridge in Mumbai (Godrej) N/A Ashoka High-Way Ad
(99.99%)
6.61
Foot-Over-Bridge in Mumbai (Priya-darshani) N/A Ashoka High-Way Ad
(99.99%)
7.18
Foot-Over-Bridge in Mumbai (Pravin Hotel) N/A Ashoka High-Way Ad
(99.99%)
7.57
Foot-Over-Bridge in Mumbai (Tagore Nagar) N/A Ashoka High-Way Ad
(99.99%)
6.60
Foot-Over-Bridge in Mumbai (Louis Wadi) N/A Ashoka High-Way Ad
(99.99%)
4.25
Foot-Over-Bridge in Mumbai (Mental Hospital) N/A Ashoka High-Way Ad
(99.99%)
4.79
Anawali – Kasegaon Road 22 Ashoka Bridgeways (5%) 73.53
 
1. The Company owns 74.00% of the shares directly and 12.74% of the shares indirectly through its 49.00% interest in Viva Infrastructure Private Limited, the legal owner of the other 26.00% of the shares in Viva Highways Private Limited.
2. An associate of the Company.
   
 
HANDED OVER BOT PROJECTS
 
Name of Project Project Cost in Rs. Million
1. Ashoka Buildcon Limited (Ankali Bridge) 85.00
2. Ashoka Buildcon Limited (Akola Bypass) 74.25
3. Ashoka Bridgeways (Mandve Bridge) 12.50
 